sub banner

Hardwood Flooring
Hardwood Flooring Installation

Installing Hardwood Flooring

HARDWOOD FLOORING NAILING SCHEDULE
National Oak Flooring Manufacturers Association
Hardwood Flooring must be installed over a proper subfloor.*
Tongue & Groove Flooring is blind nailed on the Tongue Edge with face nailing required on starting runs (1-2) and finishing runs (2-4).
Square Edge Flooring is face nailed.

Inadequate nailing contributes to cracks and noisy floors by allowing movement of the flooring.

SIZE FLOORING
SIZE NAIL TO BE USED
SPACING
¾" thick T&G Strip
x 1 ½", 2 ¼"
through 3 ¼"
2" barbed flooring cleat,*
7d or 8d flooring nail, or
2" 15 gauge staples with ½" crowns*
10" - 12" apart
8" - 10" preferred
Plank 4" - 8"2" barbed flooring cleat,*
7d or 8d flooring nail, or
2" 15 gauge staples with ½" crowns*
8" apart

* - Use 1 ½" fasteners with ¾" plywood subfloor on a concrete slab.
A concrete slab with screeds 12" o.c. does not always require a subfloor.

Blind nail along the length of strip/plank and near the ends (1"-3").
Minimum of 2 nails per strip/plank.
(Plank flooring may require face nailing and/or screws for additional fastening)
Follow Manufacturer's Instructions for installation of Plank Flooring.

Return to First Flooring Page
Chickasaw Unfinished Hardwood Flooring Page

Common Questions About Hardwood Flooring
Fox Home Page
Receive a copy of our
current advertising flyer by mail!

Thanks to National Oak Flooring Manufacturer's Association for input into this page.

QUESTIONS? Email Us
image